Nihar Associates was employed to optimise the set of EX inspection related maintenance plans for one of our client’s FPSOs.

In conjunction with our client, Nihar Associates used statistical techniques to develop a set of maintenance plans that used a sampling methodology to satisfy compliance requirements and reduced the strain on maintenance execution.

Overall Nihar Associates:

  • Re-built maintenance for the EX inspections based on the sampling methodology developed.
  • Documented the methodology used such that it could be used to improve the efficiency of the maintenance plans on our client’s other assets.
  • Successfully implemented the required changes in SAP PM.